What to Expect
And How To Prepare for Your InstallationExterior pre-installation occurs between the time you sign up for service and your scheduled interior installation.
Overhead Installation

Note: Drawings are not to scale.


Underground Installation

Note: Drawings are not to scale.



The fiber will be connected from the terminal to your residence by following your existing underground power feed. When underground trenching is needed, crews will utilize the least invasive trenching methods and will repair/restore the trenched areas.
You will need to be home for your interior installation.

Note: Drawings are not to scale.



Installers will work with you to determine the location the fiber will enter your home and where your equipment will be located.
Our installers will help you decide the best placement of your equipment for optimal performance, which will likely be:

Note: Drawings are not to scale.




Upon completion, installers will ensure that your internet is working properly.

Note: Drawings are not to scale.
Connecting
Our Community
When Will Service Be Available?
Service will be built out over the next 3 to 5 years beginning the fall of 2019. The initial phase will take advantage of Estes Park Power & Communications’ smart grid fiber-optic infrastructure, which already exists in specific neighborhoods and is currently under construction in others.
Fill out the interest form to receive broadband updates.
By registering, you will also be one of the first to receive notice of service when it is available in your area.